Fort Worth Will Consider $11.5 Million Road Contract
The council will vote on a project that adds infrastructure capacity near the local joint reserve base.
Updated on Sept. 25, 2026 in Construction

Live Poll
Should your city prioritize funding for road reconstruction and intersection improvements in your local area?
The Fort Worth City Council is set to vote on an $11.5 million road reconstruction contract for Meandering Road. The project targets infrastructure improvements from River Oaks Boulevard to Anahuac Avenue, utilizing federal funding.
Why it matters
The project aims to enhance traffic flow and safety near the Naval Air Station Joint Reserve Base through significant intersection and street upgrades. Operators in the area should monitor how these site access improvements affect commercial logistics and transit times.
The proposed $11.5 million contract funds a reconstruction project on Meandering Road. The city intends to cover the local match using regional transportation credits rather than cash outlays.
The players
Fort Worth City Council
The legislative body responsible for municipal resource allocation and infrastructure project approval in the city.
DDM Construction Corporation
A contractor proposed to manage the road reconstruction and intersection improvement work.
The details
The project includes converting Meandering Road into a three-lane configuration while implementing safety features such as a new roundabout, a four-way stop, and traffic signals. Additionally, the development introduces expanded sidewalks and bike lanes to improve multi-modal access between River Oaks Boulevard and the Naval Air Station Joint Reserve Base. DDM Construction Corporation is slated to perform the upgrades if the council approves the bid.
Timeline
September 25, 2026: The project contract proposal is currently under consideration.
Market Landscape
This project reflects a broader trend of leveraging federal grants and regional transportation credits to manage infrastructure costs. It follows established procurement patterns seen in long-term urban development projects funded through the Federal-Aid Highway Program.
Business owners along the Meandering Road corridor should prepare for potential construction-related access shifts during the implementation phase. Those involved in site logistics should review alternative routes near the base for anticipated traffic congestion.
The takeaway
Large-scale infrastructure projects prioritize military base connectivity, which can shift traffic volume and commercial accessibility in neighboring districts. Operators should track the council vote results to anticipate the start of site preparations and potential street closures.
Further reading
For broader trends in regional development, see our Construction section.
Source note: This article includes information reported by Fort Worth Star-Telegram.
Live Poll
Should your city prioritize funding for road reconstruction and intersection improvements in your local area?









